Subject: The construction of the main road Dasht-e Room Babameydan (lots 1,2,3 and 4.)
Place of execution: Kohkylouyeh Boyerahmad Province, Yassouj
Client: Ministry of Roads and Transport
Consultant: Consulting engineers Pars
Description: The construction of the main road to the length of 49 km in a place that is considered one of the most difficult mountain to travel in Iran, with the construction of eight tunnels (total length of 3888 meters) and 133 bridges (total length of 4243 meters), two bands crossing a width of 13 meters.