The construction of the third lot of highway-Mehr Lamard


Subject: The construction of the third lot of highway-Mehr Lamard

Place of execution: Province of Fars, Mehr-Lamard-Parsian Refinery

Client: Engineering and Development Company of gas of Iran

Consultant: Consulting engineers Harazrah and Consulting engineers Tarh-e Noandishan

Description: The construction and road widening Lamard-Mehr, with the approximate length of 40 km in two lanes including excavation and embankment of 1,200,000 cubic meters, the construction of 105 bridges and technical builds and water pipes, construction of large bridge in front of the polyhedron Parsian refinery, and delivery of asphalt to the order of 133,000 tons.






Text/HTML


Address:
No. 46, Ave. Shahid Arafati Crossing Manzarieh , South Dibadji, Shahid Sadr Highway, Tehran, Iran. PO Box 19585-574

Phone:

22593380(21)98+

Fax:

22593676(21)98+


Email:
info@parsgarma.com

Copyright 2021, All Rights Reserved
manganelo